FRAME CONSTRUCTIONS INTEGRATED

The front sub-frame assembly has been mounted on the central structure, and wishbones and steering rods have been fitted.

The complete sub-frame can be quickly dismounted from the central structure, by unscrewing the five anchor point bolts. Cooling water piping and air ducting can be disconnected just as simple.

Inside the central structure, the steering linkage and bucket seat have been fitted. Also the pedal box, designed and produced in-house by Ferron bv, has been installed.

For more information, contact us at info@silvermine.nl

Geplaatst in Progress Prototype.